NNoohiConstruction

Build Ticket · No. IV · 16–28 weeks

ADU Construction. Detached units. Permitted. Income-ready.

Backyard ADUs, garage conversions, and junior ADUs across the Valley. Built to current Title 24 standards and ready for long-term rental or family housing.

ADU Construction
Plate · ADUsSFV build · Permitted

The Scope · What's in the contract

Line-itemed. In writing. No surprises.

  1. 01

    Pre-design feasibility and zoning check

  2. 02

    Plans, energy compliance, and city submittal

  3. 03

    Detached new builds, garage conversions, JADUs

  4. 04

    Full MEP, kitchenette, bath, and finishes

  5. 05

    Separate metering and utility tie-ins

  6. 06

    Landscape transitions and exterior finish

The Outcome · What you get

  • 01

    Code-stamped from foundation to final inspection

  • 02

    Built for long-term tenancy · not patched together

  • 03

    Single point of accountability · plans through punch list

The Calendar · Typical timeline

▶ START TO PUNCH LIST

16–28 weeks

Written start and end date in every contract. Miss the end date and we eat the day rate. Weekly Friday update with photos, schedule, and budget.

Get a written quote
ADU Construction detail
Plate B · ADUs

▶ The Standard

Every build runs the same playbook.

  • 01Site visit · written scope · flat-rate quote.
  • 02Plans, engineering, permits · handled in-house.
  • 03Build · city-inspected at every stage.
  • 04Punch list walkthrough · 5-yr P+L warranty.
Call (818) 934-8030

Your free water test

Know exactly what's in your water. Same week.

We bring the test strips, the equipment, and five-years of installs to your kitchen sink. No charge. No obligation. You walk away knowing · even if you don't hire us.

Same-day · 5-year warranty · $0 down